Portfolio Category: Precast Stadia

Nottingham CCC – Trent Bridge

In 2007, Ebor Concretes were appointed by Clegg Costruction to suply the precast terracing and associated units for Nottinghamshire CCC's re-development of Trent Bridge which included the new Parr Stand (pictured). The development also included an extension to the Fox Road Stand which Ebor had originally¬†supplied to Sol Construction in the 1990's. The order, valued…
Read more

Dewsbury Rams RLFC

CI Construction approached Ebor Concretes with an enquiry for 70m of standing terrace for Dewsbury Rams Rugby League Club comprising 210 no. separate planks each spanning 4.6m between blockwork walls sat on a stepped in-situ concrete foundation. Ebor proposed an alternative scheme which required just 30 no. identical precast units each 2.3m wide spanning 5.8m…
Read more

Priory Club, Edgbaston

In 2011 - 2012, Ebor Concretes worked with Morgan Sindall to develop a precast concrete alternative to the in-situ scheme proposed by Architect Glen Howells and Engineer BWB Consulting for a new centre court for the Priory Tennis Club at Edgbaston. ¬† The Ebor design provided spectator terracing to the centre court and outside match…
Read more