Ebor Concretes Ltd has been designing and manufacturing bespoke precast reinforced concrete products at our Ripon works for 50 years. During that period we have undertaken work for most major contractors, supplying various structural items including ground and edge beams, columns, retaining walls, substation structures, cover slabs and wall planks weighing up to 10 tonnes each. Precast Dock Leveller Pits are a relatively new addition to our range. Contractors building distribution centres are making the precast option their preferred alternative. By choosing precast pits and associated retaining walls, our customers are regularly achieving major benefits in time and accuracy. Insulated sandwich panels are another recent addition to the company's portfolio. We also manufacture items to customers own design and specification and regularly undertake work for the major precast concrete suppliers, who have the confidence to use us as their preferred sub-contractor.

Dock Leveller Pits
The traditional practices of constructing dock pits using either in-situ concrete of prefabricated metal pans have experienced major drawbacks, leading to precast concrete becoming the preferred choice of management contractors.
The Ebor system has been developed in conjuction with a major Dock Leveller manufacturer and a full Design & Build team (specialising in Distribution Centres), to meet the following brief:-

  • Quicker site completion.

  • Phased deliveries of components to optimise vital site space.

  • Accelerated progress of following trades.

  • Factory tolerances to ensure final fit of the Dock Leveller equipment.
  • The package offered by the Ebor System includes:-

  • The supply and delivery of Precast Pit Modules (with cast in top protection guards) complete with Dock Wall Units.

  • Full design service with Ebor engineers preparing all drawing and providing supporting calculations in accordance with BS8110 for approval prior to manufacture.

  • Method statement for the erection Sub-Contractor
  • Stairs and Landing Slabs
    Save on temporary scaffolding. Instant access to all floors immediately stairs are placed. Benefit from flexible design. Our fully adjustable steel framed moulds allow the designer a free hand to choose any tread and riser combination together with a maximum flight width of around 2600mm. Flights can be made with integral top and bottom landings eliminating the need for support beams and seperate landing slabs.
    Encasement of Clients' Structural Steelwork
    We have the experience of encasing clients fabricated structural steel in concrete to provide fire protection, to any specified profile prior to delivery to site. We can include various cast-in inserts for masonry supports etc.